Measured results, real plants
Ferrara, Italy
First Italien P-Wave project at medium-sized WtE boiler
Manual explosion cleaning avoided with one P-Wave Generator at final superheater. Follow up order received for second boiler based on positive results.
Read more →Reduce soot-blower steam consumptionPaiton, Indonesia
Major Indonesian power plant reduces CO2 emissions with alternative for steam soot blowers (Paiton/Jawa)
Soot blower steam consumption reduced by 65% — back-pass flue gas temperature reduced by 10 °C with saving of 13,000 t coal/yr
Read more →Reduce soot-blower steam consumptionXi'an, China
Increasing boiler performance at large WtE boiler
A single P-Wave generator tested in very large WtE boiler. Saving in space and steam consumption compared to boiler cleaning with steam soot-blowers
Read more →Replacement of other type shock pulse generatorsNaha/Okinawa, Japan
WtE plants maximizes maintenance efficiency and performance
Operation of vertical boiler without soot-blowers and manual explosion cleaning - successful conversion to P-WAVE generators.